Difference between revisions of "GIS"
m (one more done (for a while now actually...)) |
m (applied assignment finished) |
||
Line 14: | Line 14: | ||
* [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/lab13/index.htm Meta Data Integration] | * [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/lab13/index.htm Meta Data Integration] | ||
* [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/lab14/index.htm Viewshed Analysis] | * [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/lab14/index.htm Viewshed Analysis] | ||
− | * [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/applied/index.htm Applied lab assignment in Google Earth Pro: suitable locations for wind turbines and solar panel installations on campus] | + | * [http://www-laep.ced.berkeley.edu/classes/C188/2007_fall/c188-ab/applied/index.htm Applied lab assignment in Google Earth Pro: suitable locations for wind turbines and solar panel installations on campus] |
;Notes | ;Notes | ||
:† – assignment not yet completed | :† – assignment not yet completed | ||
:<nowiki>*</nowiki> – [http://www-laep.ced.berkeley.edu/classes/C188/htdocs07/score.htm assignment noted as "explemplary" by GSI] | :<nowiki>*</nowiki> – [http://www-laep.ced.berkeley.edu/classes/C188/htdocs07/score.htm assignment noted as "explemplary" by GSI] |
Revision as of 08:26, 29 December 2007
As part of Geography C188 at UC Berkeley, I have undertaken a number of GIS analyses. They are listed below:
- Spatial Browser - ArcMap 9.x
- Database Management System
- Creating a Layout with ArcMap 9.x and the East Bay Data Set
- Projections
- Spatial Data Input *
- Field Mapping, Digitizing, Translation, and Topology in Spatial Data
- Vector/Polygon Suitability Analysis
- Raster/Surface Suitability Analysis
- Creating TIN and 3D scenes with ArcScene
- Address Geocoding Process
- Image Integration and Analysis
- Meta Data Integration
- Viewshed Analysis
- Applied lab assignment in Google Earth Pro: suitable locations for wind turbines and solar panel installations on campus
- Notes
- † – assignment not yet completed
- * – assignment noted as "explemplary" by GSI